Product Code DTD-204-CONL
Thermal All-in-One (DTD) Ducting Ancillaries Range
For installation into the duct clamp, push the two pre-cut lengths of ducting firmly into the clamp at opposite ends. Double check the cut ducting is square. Failing to do so may cause air leakage. The centre joint of the duct should be located on the centre flange of the clamp. Ensure the ducting is fully pressed itno the clamp to create an airtight seal.
We advise that the duct is cut with a very sharp blade or fine toothed saw (we recommend a minimum of 14 teeth per inch). The cutting blade length should be at least the same length as the thickness of the ducting.
Manufactured in South Wales and Aylesford, our two production facilities ensure consistent availability through merchant and electrical wholesalers. Our award winning ducting systems ensure precise fit and maximum performance, reducing installation time and costs. At Domus we are committed to meeting Building Regulations and emerging environmental standards, Domus Ventilation continues to lead the market with cutting-edge solutions.
Available in select sizes
Contact us by email or phone and we will help find the right system for you.
Get in touch